CPC31220 Certificate III in Wall and Ceiling Lining
On completion of this course, you will gain the knowledge and skills to install and finish plasterboard and fibre cement sheeting to line walls and ceilings.

This course is part of the Lower fees, local skills initiative. From 1 January 2020 through to 31 December 2025 you'll only pay half the course fees, capped at $1,200; or $400 if you're aged 15—24 or eligible for a concession, plus resource fees and other fees that may apply to your course.
For more information click here
Overview
Campus Albany | Bunbury
When All year round
Study Mode Apprenticeship
This qualification will prepare you with the skills and knowledge to work in and provide a trade outcome in wall and ceiling. You will learn skills required to fix standard plasterboard sheets to walls and ceilings, fixing battens and mixing plastering compounds. You will also learn how to work effectively and sustainably in the construction industry, plan and organise work, carry out measurements and calculations and apply Occupational Health and Safety requirements.
- Would you like hands-on experience and a solid foundation to build a successful career in wall and ceiling lining and the broader Building and Construction Industry?
- Would you like to transform your passion into skilled craftmanship as a wall and ceiling liner?
Then this is the course for you.
To make an informed choice about the suitability of this course, you must consider these essential skills and knowledge below. You must:
- Enjoy manual work and have a good level of physical fitness.
- Be able to communicate well with others.
- Demonstrate your ability to work independently as well as in a team environment.
- Show your ability to follow instructions and Work Health and Safety procedures.
- Have good hand-eye coordination and strong spatial awareness.
- Demonstrate well-developed planning, organisational and problem-solving skills.
- Show confidence working from heights.
This course will provide you with the skills and knowledge to work in the wall and ceiling lining industry. You will learn how to fix plasterboard sheets to walls and ceilings, mix plastering compounds, install suspended ceilings, construct bulkheads, interpret plans and apply Work Health and Safety requirements.
Time Commitment – You will need to allocate appropriate time to complete this course. This includes attending classes on-site and/or online as outlined in the study mode; and undertake independent study outside of class hours, including private study, assessment preparation, research, and complete assessment requirements.
Below are some of the important skills that you will be required to develop and demonstrate during training. These skills are highly valued by industry:
- Respectful Communication - Interact with people from different backgrounds, share ideas effectively and build trust.
- Teamwork – Collaborate with others, show them respect, and be open to feedback.
- Problem Solving - There is always a solution. How do you respond to a challenge? If you spot a problem, we encourage you to ask questions, clarify as needed, and respond appropriately within your training.
- Initiative - Stay motivated, take proactive steps, and seek help when necessary.
- Planning - Manage time well. Knowing how to prioritise and completing your tasks efficiently are crucial for your success.
- Self-Management - Reflect on your performance. Acknowledge your success and take responsibility for your shortcomings.
- Learning – Recognise your strengths while embracing new knowledge and experiences to support personal and professional growth. Some of the skills you will learn include:
- Measurements and calculations.
- Read and interpret plans.
- Fix standard plasterboard sheets.
- Fix battens, wet area sheets, ceiling sheets and fibre cement board.
- Mix and apply plastering compounds.
- Manually sand plaster work.
- Assemble partitions.
- Construct and install bulkheads and paper-faced cornices.
- Install dry wall passive fire-rated systems and suspended ceilings.
- Erect and dismantle restricted height scaffolding
- Workplace communication.
- Work safely at heights.
- Apply workplace health and safety practices.
- Technology - Adapt to new tools, access digital resources, and integrate technology into your learning.
Select your preferred campus and apply
All year round, 2026
Details
Units
Not all units and study modes are offered at all campuses. Please check with your local campus.
Core
National ID | Unit title |
---|---|
CPCCCA3014 | Construct and install bulkheads |
CPCCCM2012 | Work safely at heights |
CPCCOM1012 | Work effectively and sustainably in the construction industry |
CPCCOM1013 | Plan and organise work |
CPCCOM1014 | Conduct workplace communication |
CPCCOM1015 | Carry out measurements and calculations |
CPCCOM2001 | Read and interpret plans and specifications |
CPCCPB3001 | Fix standard plasterboard wall sheets |
CPCCPB3002 | Fix standard plasterboard ceiling sheets |
CPCCPB3003 | Fix battens |
CPCCPB3004 | Fix wet area sheets |
CPCCPB3005 | Fix ceiling sheets to external protected areas |
CPCCPB3006 | Fix fibre cement board |
CPCCPB3007 | Apply levels of finish standards to planning and inspection of own work |
CPCCPB3008 | Mix plastering compounds |
CPCCPB3009 | Finish plasterboard joints manually |
CPCCPB3010 | Manually sand plaster work |
CPCCPB3012 | Cut and fix paper-faced cornices |
CPCCWC3003 | Install dry wall passive fire-rated systems |
CPCCWC3004 | Install suspended ceilings |
CPCCWHS2001 | Apply WHS requirements, policies and procedures in the construction industry |
Elective
National ID | Unit title |
---|---|
CPCCCA3026 | Assemble partitions |
CPCCCM2006 | Apply basic levelling procedures |
CPCCCM2008 | Erect and dismantle restricted height scaffolding |
CPCCPB3017 | Rectify faults in drywall applications |
CPCCPB3018 | Use vacuum and electric sanding equipment to finish plaster work |
CPCCPB3019 | Inspect equipment for serviceability |
CPCCPB3022 | Use mechanical jointing equipment to finish joints |
CPCCSP3005 | Install pre-cast decorative mouldings |
Details
Units
Not all units and study modes are offered at all campuses. Please check with your local campus.
Core
National ID | Unit title |
---|---|
CPCCCA3014 | Construct and install bulkheads |
CPCCCA3026 | Assemble partitions |
CPCCCM2012 | Work safely at heights |
CPCCOM1012 | Work effectively and sustainably in the construction industry |
CPCCOM1013 | Plan and organise work |
CPCCOM1014 | Conduct workplace communication |
CPCCOM1015 | Carry out measurements and calculations |
CPCCOM2001 | Read and interpret plans and specifications |
CPCCPB3001 | Fix standard plasterboard wall sheets |
CPCCPB3002 | Fix standard plasterboard ceiling sheets |
CPCCPB3003 | Fix battens |
CPCCPB3004 | Fix wet area sheets |
CPCCPB3005 | Fix ceiling sheets to external protected areas |
CPCCPB3006 | Fix fibre cement board |
CPCCPB3007 | Apply levels of finish standards to planning and inspection of own work |
CPCCPB3008 | Mix plastering compounds |
CPCCPB3009 | Finish plasterboard joints manually |
CPCCPB3010 | Manually sand plaster work |
CPCCPB3012 | Cut and fix paper-faced cornices |
CPCCWC3003 | Install dry wall passive fire-rated systems |
CPCCWC3004 | Install suspended ceilings |
CPCCWHS2001 | Apply WHS requirements, policies and procedures in the construction industry |
Elective
National ID | Unit title |
---|---|
CPCCCM2006 | Apply basic levelling procedures |
CPCCCM2008 | Erect and dismantle restricted height scaffolding |
CPCCPB3017 | Rectify faults in drywall applications |
CPCCPB3018 | Use vacuum and electric sanding equipment to finish plaster work |
CPCCPB3019 | Inspect equipment for serviceability |
CPCCPB3022 | Use mechanical jointing equipment to finish joints |
CPCCSP3005 | Install pre-cast decorative mouldings |
All year round, 2025
Details
Units
Not all units and study modes are offered at all campuses. Please check with your local campus.
Core
National ID | Unit title |
---|---|
CPCCCA3014 | Construct and install bulkheads |
CPCCCA3026 | Assemble partitions |
CPCCCM2012 | Work safely at heights |
CPCCOM1012 | Work effectively and sustainably in the construction industry |
CPCCOM1013 | Plan and organise work |
CPCCOM1014 | Conduct workplace communication |
CPCCOM1015 | Carry out measurements and calculations |
CPCCOM2001 | Read and interpret plans and specifications |
CPCCPB3001 | Fix standard plasterboard wall sheets |
CPCCPB3002 | Fix standard plasterboard ceiling sheets |
CPCCPB3003 | Fix battens |
CPCCPB3004 | Fix wet area sheets |
CPCCPB3005 | Fix ceiling sheets to external protected areas |
CPCCPB3006 | Fix fibre cement board |
CPCCPB3007 | Apply levels of finish standards to planning and inspection of own work |
CPCCPB3008 | Mix plastering compounds |
CPCCPB3009 | Finish plasterboard joints manually |
CPCCPB3010 | Manually sand plaster work |
CPCCPB3012 | Cut and fix paper-faced cornices |
CPCCWC3003 | Install dry wall passive fire-rated systems |
CPCCWC3004 | Install suspended ceilings |
CPCCWHS2001 | Apply WHS requirements, policies and procedures in the construction industry |
Elective
National ID | Unit title |
---|---|
CPCCCM2006 | Apply basic levelling procedures |
CPCCCM2008 | Erect and dismantle restricted height scaffolding |
CPCCPB3017 | Rectify faults in drywall applications |
CPCCPB3018 | Use vacuum and electric sanding equipment to finish plaster work |
CPCCPB3019 | Inspect equipment for serviceability |
CPCCPB3022 | Use mechanical jointing equipment to finish joints |
CPCCSP3005 | Install pre-cast decorative mouldings |
Details
Units
Not all units and study modes are offered at all campuses. Please check with your local campus.
Core
National ID | Unit title |
---|---|
CPCCCA3014 | Construct and install bulkheads |
CPCCCM2012 | Work safely at heights |
CPCCOM1012 | Work effectively and sustainably in the construction industry |
CPCCOM1013 | Plan and organise work |
CPCCOM1014 | Conduct workplace communication |
CPCCOM1015 | Carry out measurements and calculations |
CPCCOM2001 | Read and interpret plans and specifications |
CPCCPB3001 | Fix standard plasterboard wall sheets |
CPCCPB3002 | Fix standard plasterboard ceiling sheets |
CPCCPB3003 | Fix battens |
CPCCPB3004 | Fix wet area sheets |
CPCCPB3005 | Fix ceiling sheets to external protected areas |
CPCCPB3006 | Fix fibre cement board |
CPCCPB3007 | Apply levels of finish standards to planning and inspection of own work |
CPCCPB3008 | Mix plastering compounds |
CPCCPB3009 | Finish plasterboard joints manually |
CPCCPB3010 | Manually sand plaster work |
CPCCPB3012 | Cut and fix paper-faced cornices |
CPCCWC3003 | Install dry wall passive fire-rated systems |
CPCCWC3004 | Install suspended ceilings |
CPCCWHS2001 | Apply WHS requirements, policies and procedures in the construction industry |
Elective
National ID | Unit title |
---|---|
CPCCCA3026 | Assemble partitions |
CPCCCM2006 | Apply basic levelling procedures |
CPCCCM2008 | Erect and dismantle restricted height scaffolding |
CPCCPB3017 | Rectify faults in drywall applications |
CPCCPB3018 | Use vacuum and electric sanding equipment to finish plaster work |
CPCCPB3019 | Inspect equipment for serviceability |
CPCCPB3022 | Use mechanical jointing equipment to finish joints |
CPCCSP3005 | Install pre-cast decorative mouldings |